EnglishEspañolPortuguêsFrançais日本語DeutschItalianoالعربيةБеларускаяአማርኛУкраїнськаÍslenskaMagyarAfrikaansČeštinaCymraegHrvatskiMāoriРусскийKiswahiliBosanskiCatalàGalegoGàidhligБългарскиLietuviųTiếng ViệtCebuanoລາວМонголမြန်မာខ្មែរFilipinoBahasa MelayuગુજરાતીBasa JawaTürkçeAzərbaycanՀայերեն繁體中文Euskara简体中文DanskNederlandsहिन्दीSuomiBahasa IndonesiaGaeilgeҚазақшаNorskPolskiRomânăСрпскиSvenskaไทย한국어עברית

Explore TTH Pergola

TTH PERGOLA

Blog

Product insights

Solar Canopy Selection: Prepare a Decision Brief

Compare solar canopy proposals with an eight-field decision brief for usable space, site conditions, equipment and responsibilities.

Photovoltaic carport parking, an open vehicle door and a separate pedestrian strip.
Concept illustration: Photovoltaic carport parking, an open vehicle door and a separate pedestrian strip.

Put the decision on one page

For a TENGTAIHONG / TTH enquiry, the useful starting point is the solar canopy product, followed by a brief describing your actual project. A product illustration shows a configuration; the agreed quotation and project documents must identify what is supplied.

Before asking suppliers to recommend a single-space or double-space canopy, record the same starting information for each option. Use a dated drawing revision so a later change does not quietly become part of only one proposal.

This is a comparison brief, not an engineering approval form. A blank field means that part of the decision remains open. Do not turn “to be confirmed” into a supplier commitment.

Selection recordProject information to noteDocuments to provide or request
Intended useVehicles, parking pattern and any other covered useSite brief and actual vehicle information
Usable areaClear space needed below the roofMeasured site plan with obstructions
Selection access routesVehicle approach, door opening and pedestrian routeMarked movement plan
StructureProposed model, support positions and roof outlineSupplier drawing for that configuration
Site conditionsSupporting surface, drainage route and known constraintsSite information for the responsible designer
PV scopeProposed modules and other included equipmentItemised equipment schedule
Selection electrical responsibilitiesDesigner, installer and connection responsibilitiesWritten scope from the responsible parties
Outstanding decisionsMissing information and who will resolve itOpen-items list with a response date

Compare layout options against the same use case

Use the same vehicles and site boundaries when comparing configurations. If one drawing excludes a storage area while another includes it, mark that difference before judging the usable parking space. Check doors and access with both spaces occupied in a double layout.

The single-versus-double layout guide explains the measurements to collect. Send the supplier the working space you need, then ask for the proposed dimensions between supports. Overall roof dimensions alone do not answer that question.

Keep future intentions separate from the present order. A possible charger or battery is a question for the design team, not an item automatically included in a canopy purchase. Ask which decisions must be made now and which need a later, separately approved design.

Check how the shelter meets the PV package

Start by identifying the technical information needed to compare proposals. DOE/FEMP procurement guidance places technical specifications in procurement and design review. It is guidance for US federal projects; it neither defines a TTH supply package nor approves a canopy for a site.

Ask for the module arrangement to be shown on the same revision of the canopy layout used for quotation. Record who checks the mounting interface and who confirms any cable route or equipment location. Where two companies supply different parts, ask them to identify the documents each needs from the other.

For prices and exclusions, use the separate solar carport quotation scope checklist. Keep this selection brief focused on whether an option can proceed to coordinated design; it should not substitute for a signed scope or a project-specific calculation.

Animation close-up beneath photovoltaic modules showing a cable loop and inline connector over a beam.
Concept illustration: Animation close-up beneath photovoltaic modules showing a cable loop and inline connector over a beam.

Use three decision labels

Mark each option “ready for detailed review”, “needs information” or “does not meet the brief”. These are buyer working labels, not certifications.

An option can move to detailed review once its proposed layout and supply boundary are clear enough to assess. An unsupported energy promise, an unconfirmed access dimension or a missing responsible designer belongs in “needs information”. If the supplier proposes a change, ask for a revised drawing and update the affected comparison fields.

And keep the original brief. It gives you a way to check whether a later quotation still describes the project you intended to buy.

Does the canopy brochure include a complete energy assessment?

No. A site assessment needs the proposed module system, location, orientation, shading and relevant electrical assumptions. Use the TTH brochure to understand the product, then request the assessment appropriate to the actual project.

Continue planning

Topics

Electrical scopeVehicle accessShading assessmentSystem interfaces
View system details →Contact TTH
← Blog
WhatsApp

Privacy