PACKING, DELIVERY & INSTALLATION
From our workshop to your site.
Checked components, protective packaging and a coordinated shipment. We confirm delivery and installation responsibilities before dispatch.
Follow the delivery process01 / PACKING & DISPATCH
Six steps, prepared for the journey.
Components are checked against the order, packed separately and consolidated for port shipment.
Final checks
Once factory checks are passed, components and accessories are checked against the order.
Separate packing
Structural components and accessories are organized separately and protected in sturdy corrugated cartons.
Labels & packing list
Each package is labelled to correspond with the packing list for receiving checks.
Timber reinforcement
Timber framing is secured around the packages to support handling during transport.
Forklift loading
A forklift transfers the packages onto the truck, where they are positioned and secured.
Port consolidation
Goods are transported to the port and loaded into a container under the confirmed shipping arrangement.
Packaging, transport arrangements and delivery timing are confirmed for the order and destination.
Protection, layer by layer.
Transport and delivery photos
02 / RECEIVING & UNLOADING
Plan the arrival before it arrives.
Confirm vehicle access, unloading space, handling equipment and the receiving contact. Assess the route to storage and installation using the final package dimensions.
- Match package quantities and labels to the packing list.
- Inspect packaging and components; photograph damage or missing items and contact the project team promptly.
- Keep packages dry and store components as instructed until installation.
Unloading illustrations
03 / INSTALLATION
Prepare. Assemble. Check.
Use the manual supplied for the ordered model. Resolve any mismatch in parts, drawings or site conditions before continuing.
Prepare the site
Confirm foundations, fixing positions, drainage and any required electrical supply with the responsible professionals.
Assemble in sequence
Check parts against the manual, then complete positioning, frame assembly, roof installation and agreed accessories.
Check before handover
Check alignment, connections, fixings and drainage. Commission motorized roofing, lighting and screens where fitted.
Installation references
These pages illustrate the 6 × 4 m installation manual filed under the 220 series. Use the manual and revision supplied for your ordered model; the dimensions and component quantities shown belong to this example.




A clear handover, ready for use.
Record inspection results and any outstanding items. Retain the packing list, manual revision and handover record for maintenance and service.
Installation support
Local installation can be arranged in the US, Canada, Australia and UAE. Elsewhere, ask about installer resources and remote assembly support. Local labor, foundations, permits, electrical work and unloading are included only where confirmed in the order.