Choose your language

EnglishEspañolPortuguêsFrançais日本語DeutschItalianoالعربيةБеларускаяአማርኛУкраїнськаÍslenskaMagyarAfrikaansČeštinaCymraegHrvatskiMāoriРусскийKiswahiliBosanskiCatalàGalegoGàidhligБългарскиLietuviųTiếng ViệtCebuanoລາວМонголမြန်မာខ្មែរFilipinoBahasa MelayuગુજરાતીBasa JawaTürkçeAzərbaycanՀայերեն繁體中文Euskara简体中文DanskNederlandsहिन्दीSuomiBahasa IndonesiaGaeilgeҚазақшаNorskPolskiRomânăСрпскиSvenskaไทย한국어עברית

Explore TTH Pergola

PACKING, DELIVERY & INSTALLATION

From our workshop to your site.

Checked components, protective packaging and a coordinated shipment. We confirm delivery and installation responsibilities before dispatch.

Follow the delivery process
Packed by order. Identified for receiving and assembly.

01 / PACKING & DISPATCH

Six steps, prepared for the journey.

Components are checked against the order, packed separately and consolidated for port shipment.

  1. Final checks

    Once factory checks are passed, components and accessories are checked against the order.

  2. Separate packing

    Structural components and accessories are organized separately and protected in sturdy corrugated cartons.

  3. Labels & packing list

    Each package is labelled to correspond with the packing list for receiving checks.

  4. Timber reinforcement

    Timber framing is secured around the packages to support handling during transport.

  5. Forklift loading

    A forklift transfers the packages onto the truck, where they are positioned and secured.

  6. Port consolidation

    Goods are transported to the port and loaded into a container under the confirmed shipping arrangement.

Packaging, transport arrangements and delivery timing are confirmed for the order and destination.

Protection, layer by layer.

Components organized before packing
Protective corrugated packaging
Timber framing for handling
Packages secured before loading

Transport and delivery photos

Container loading
Timber-framed packages loaded for transport
Tail-lift unloading

02 / RECEIVING & UNLOADING

Plan the arrival before it arrives.

Confirm vehicle access, unloading space, handling equipment and the receiving contact. Assess the route to storage and installation using the final package dimensions.

  • Match package quantities and labels to the packing list.
  • Inspect packaging and components; photograph damage or missing items and contact the project team promptly.
  • Keep packages dry and store components as instructed until installation.

Unloading illustrations

Truck-side handling
Residential driveway delivery
A clear receiving area
Packing-list checks on arrival
Warehouse receiving
Commercial courtyard delivery

03 / INSTALLATION

Prepare. Assemble. Check.

Use the manual supplied for the ordered model. Resolve any mismatch in parts, drawings or site conditions before continuing.

  1. Prepare the site

    Confirm foundations, fixing positions, drainage and any required electrical supply with the responsible professionals.

  2. Assemble in sequence

    Check parts against the manual, then complete positioning, frame assembly, roof installation and agreed accessories.

  3. Check before handover

    Check alignment, connections, fixings and drainage. Commission motorized roofing, lighting and screens where fitted.

Factory component checks

Installation references

These pages illustrate the 6 × 4 m installation manual filed under the 220 series. Use the manual and revision supplied for your ordered model; the dimensions and component quantities shown belong to this example.

Complete component list page from the 6 × 4 m installation manual
Profiles & component listView full page
Complete frame alignment and diagonal check page from the 6 × 4 m installation manual
Frame alignment & diagonal checksView full page
Complete gutter corner and water outlet assembly page from the 6 × 4 m installation manual
Gutter corners & water outletsView full page
Complete motor and LED wiring page from the 6 × 4 m installation manual
Motor & LED connectionsView full page

A clear handover, ready for use.

Record inspection results and any outstanding items. Retain the packing list, manual revision and handover record for maintenance and service.

Installation support

Local installation can be arranged in the US, Canada, Australia and UAE. Elsewhere, ask about installer resources and remote assembly support. Local labor, foundations, permits, electrical work and unloading are included only where confirmed in the order.

Tell us where your project is going.

Share the model, delivery address and site access details so we can confirm your shipping and installation scope.

Discuss delivery & installation

WhatsApp

Privacy