Outdoor solutions
Single or Double Solar Canopy: Measure the Space You Will Use
Compare solar canopy layouts with a site measurement worksheet covering vehicle access, doors, clear space between supports and equipment areas.

Record the existing site before selecting a roof size
TTH solar canopy product is a starting point for configuration discussions. Ask for a dimensioned drawing of the exact proposed arrangement before treating an illustrated layout as a fit for your site.
Prepare a plan showing the parking area and its approach. Mark fixed boundaries such as walls, gates and planting. Include level changes or obstructions that the responsible designer will need to investigate. Do not assume a paved surface is suitable for the proposed foundations.
Use one unit throughout the plan and state it beside the dimensions. Label measurements taken on site separately from estimates. If access or a boundary cannot be measured safely, leave it unresolved for a suitable survey rather than guessing.
The worksheet deliberately contains no universal minimum dimensions. The project location, use and applicable requirements must be checked by the responsible parties.
| Layout observation | Record on the site plan | Confirm the proposed arrangement with |
|---|---|---|
| Vehicle body and mirrors | Actual vehicle dimensions and mirror position during access | Buyer, using vehicle information and site observations |
| Doors and rear access | Space needed for normal entry and loading | Buyer and layout designer |
| Vehicle approach | Gate opening, approach direction and turning constraints | Site or traffic designer where required |
| Clear parking space | Distances between proposed supports and other obstructions | Canopy supplier and project designer |
| Vehicle access height | Required vehicle access and the proposed lowest overhead elements | Supplier and responsible project designer |
| Walking route | Path from each parked vehicle to the destination | Site designer, including applicable accessibility review |
| Equipment or storage | Occupied area and access needed for service | Responsible equipment designer or installer |
| Roof and runoff | Roof edge, proposed drains and discharge route | Canopy and site drainage designers |
Test everyday movements on each option
For a single-space layout, trace arrival, parking and departure, then check door opening and access to the building. Include the rear hatch or loading activity if it matters to the intended use.
For a double-space layout, repeat the exercise with both vehicles shown. Check whether a driver can leave one vehicle without relying on the second space being empty. Draw a larger planned vehicle as a separate case rather than stretching a generic car symbol until it looks convenient.
Keep the roof outline and support positions on separate labelled layers or use different line styles. Ask the supplier to identify the clear dimensions that control the movements you have drawn. If a post position conflicts with the route, request a reviewed alternative. Moving a post on a buyer sketch does not approve a structural alteration.

Keep equipment outside the unmeasured leftovers
Show storage and proposed electrical equipment as occupied space. Ask the responsible equipment provider for access and clearance requirements before deciding that an unused corner is suitable. A cabinet door, service visit or cable route can affect how the parking area works.
A future charger should be marked as a future intention unless it is part of the agreed order. Its position and electrical provision need their own review. The selection checklist helps keep those decisions visible without assuming a complete energy package is included.
Send back a marked comparison, not just a preferred picture
Return the supplier's drawing with each unresolved point numbered. For each point, record the observation, the requested clarification and the drawing revision that resolves it. Keep “measured on site” distinct from “proposed by supplier”.
But do not approve on the strength of this worksheet alone. Use it to obtain a coordinated dimensioned proposal, with the site-specific structural and electrical reviews completed by the responsible parties. The final choice should explain how people and vehicles will use the space, not only how many cars appear in the rendering.
Is a double canopy simply twice a single canopy?
Not necessarily. Shared access, support positions and vehicle movement affect the layout. Compare the proposed TTH arrangements using the real vehicles and site approach rather than only multiplying a footprint.