Buying guides
Pergola screens: confirm mounting parts before you order
Plan pergola screens or curtains with a complete accessory schedule. Confirm supplied mounting parts and compatibility with your pergola configuration.

When ordering pergola screens, ask for the equipment that connects each screen to the selected frame. A quotation that names the fabric accessory can still leave its mounting scope unclear.
The useful document is a complete accessory schedule for your aluminum louvered pergola. It records which opening gets which product and identifies the components needed to fit it. I would settle that schedule before approving the order.
Choose curtains and screens by their actual construction
Suppliers use side-enclosure names differently. Ask for a drawing of the proposed system rather than deciding from the word “screen.”
A curtain arrangement may use fabric panels hanging from a track or other specified attachments. A ZIP screen arrangement may use a roller housing and side guides that retain the fabric edges. The supplier should identify the construction of the offered product and the parts supplied with it.
These arrangements create different questions about the frame. A curtain needs somewhere to hang and room to gather when open. A guided screen needs the mounting interfaces shown in its approved drawing. Confirm the complete assembly; matching the advertised width is only an initial check.
Give every side its own line on the drawing
Label the sides A through D on a plan. Mark the house wall and the entrance you use most often. Then describe the accessory on each treated side, including its intended opening direction.
“One side screen” leaves room for misunderstanding. Identify the side on the drawing, with the opening dimensions measured using the supplier’s method. Include nearby doors or steps that affect daily use.
For a freestanding configuration, have the supplier show how the accessory relates to the specified posts and beams. With a wall-mounted configuration, ask which parts support the enclosure at the building-facing edge. A wall connection for the roof does not establish the accessory arrangement by itself. Have any required additional member identified in the quotation.
Ask for a complete accessory schedule
Use this table to prepare the enquiry. It lists items to confirm, not a universal parts list. Mark items that do not apply to the chosen system.
| Order record | Confirmation to request |
|---|---|
| Side and opening | Labelled opening with confirmed accessory dimensions |
| Fabric assembly | Named curtain or screen model and panel quantity |
| Mounting components | Required support member and its attachment components |
| Movement components | Applicable fabric movement hardware with part references |
| Supplied scope | Included items and separately supplied work |
| Instructions | Matching accessory manual and approved drawing revision |
Get part references and quantities where the supplier provides them. If a supporting beam is already included in the frame package, ask the supplier to point to that item. If it is extra, give it a separate order line.
And check the exclusions. An attractive accessory price is difficult to compare when the mounting parts appear in another quotation or remain unresolved.
Keep power and controls conditional
Only request an electrical scope where the selected accessory uses power. Ask which motor and control equipment belongs to that specific screen and what is supplied. Agree who handles the local electrical work.
Do not assume a powered roof controller also operates the screens. Request written confirmation of the proposed controls and operating instructions. For a manual curtain arrangement, keep the discussion on its actual hardware and movement.
Review the documents before installation
Share the approved schedule with your installer before booking the work. Use the installation-manual review guide to check that the documents match the delivered configuration.
On receipt, compare the accessory labels and quantities with the agreed list. Keep the packaging identifiers until discrepancies are resolved. The missing-parts receiving checklist explains how to record a shortage without losing the link to the order.
If a mounting component is unclear, ask the supplier to resolve it against the drawing before anyone modifies the frame. Retain the reply with the order records.
Prepare the quotation enquiry
Review the TTH pergola range to begin the model discussion. Send your side-labelled plan with a project quote enquiry, then request confirmation of compatibility and supplied scope for that configuration. The sample photograph shows an arrangement to discuss; it does not define what every order includes.
Keep unresolved items visible on the schedule. “Mounting parts to be confirmed” is more useful than an empty cell that someone later reads as included.
Sources
The editorial prompt was an October 1, 2026 customer account about curtain mounting components. The account was not independently verified and does not establish a general defect or another supplier’s order scope. The checklist above is buyer planning guidance, not installation instructions or a product specification.