Hardtop pavilion planning
Gazebo roof holes do not line up: check identification before modifying parts
Check parts, orientation, frame condition and instructions before altering a roof hole that does not align.

Identify the exact mismatch first
When roof holes do not align, identify the two components and exact location before reaching for a tool. Check identifiers, orientation and current instructions, while the installation lead reviews the related frame condition and previous stages. Different issues can appear as the same small mismatch. The owner should not decide which component to alter by intuition. Overall and close views help the supplier understand adjacent parts, preserving a clearer basis for investigating identification, version or installation questions before any modification.
Review information rather than forcing a fit
Check that the pieces match the correct list and that orientation follows the drawing, then review the assembly state required by the actual manufacturer. Any staged fastening or alignment checks belong to that model and its installer. Ask precise questions about unclear diagrams instead of trying different holes repeatedly. A screw being forced into place does not establish a correct connection. Record what has already been checked so technical support can concentrate on the unresolved difference rather than repeat the same questions.
Consider a corner that repeatedly fails to meet
Imagine most panels are fitted but one final corner refuses to meet. It may be tempting to blame the last piece immediately. Review its identity and the relevant earlier assembly state, then send the supplier the overall direction, mismatch and completed checks. This does not diagnose a frame or preceding-panel problem; it prevents the last visible symptom from becoming the only investigated location. Any proposed replacement or adjustment should identify affected parts and the completion check rather than a vague instruction to fix it on site.
Document the approved response and resulting condition
Record the supplier response, person implementing it and resulting condition. Include any approved site modification in handover documents so later service does not infer the original state incorrectly. A structure remaining upright does not establish completion of unresolved connections; responsible personnel should decide whether dependent work proceeds.
If the same mismatch appears at several locations, report the positions and identifiers together. Grouped evidence helps support identify a pattern without repeating unapproved experiments at every point.
- Identify the two components and drawing location.
- Check identity, orientation and preceding assembly state.
- Do not enlarge holes without confirmation; document approved responses.
Can a drill solve a small hole mismatch?
Do not treat enlargement as the default. Check identity, orientation, drawings and assembly state, then obtain a location-specific response. Any approved modification should be performed by responsible personnel and recorded with its verification.
More questions, practical answers →